Toilet decoration is a key part, if not waterproof, it will bring unnecessary trouble to the later stage. However, at present, there are many kinds of waterproof materials for toilet decoration, basically the waterproof effect is good, but pay attention to the specific construction details of toilet waterproof, and repair the problems in time if found. Then, the next small edition for you to introduce toilet decoration waterproof skills and toilet decoration waterproof specifications.
Causes of water seepage in toilet
1. Rubber concrete cracks.
2. After the waterproof layer is completed, the latter process destroys the waterproof layer (facing brick).
3. Bad waterproof material is used (no good product is cheap).
4. The waterproof layer is not made as required or the thickness of waterproof layer is not enough (> 1.2mm).
5. Failed to do node processing as required (bad node processing).
6. The original waterproof layer is damaged by the decoration slotted and buried pipe, which causes water leakage.
7. When making waterproof, the base surface does not meet the requirements, with sand, loose and other phenomena.
8. The shrinkage of water pipe is different from that of cement.
Waterproof skill of toilet decoration
1. Be sure to make the wall waterproof. Before laying the wall tiles, make the wall waterproof. In general, 30 cm high water-proof treatment should be done for the wall in the water-proof treatment, but for the light weight wall that is not load-bearing, the whole wall should be waterproof, at least 60 cm high.
2. The joint between the wall and the ground, and the joint between the upper and lower water pipes and the ground are the most likely places to have problems. We must urge the workers to handle these corners, and the waterproof coating must be applied in place.
3. If the original floor tiles of the toilet need to be replaced, the original floor tiles must be leveled with cement mortar first after chiseling, and then waterproof treatment shall be carried out, so as to avoid the leakage caused by uneven thickness of the waterproof coating. Be sure to clean up the ground before waterproofing.
4. Try not to damage the original waterproof layer. Generally, the floor of the newly delivered building is provided with a waterproof layer. Therefore, without damaging the original waterproof layer, there will be no leakage.
5. The decoration team is required to provide cement mulch for the upper and lower water pipes of the toilet, brush 10-20cm waterproof coating from the ground up, and then redo the ester waterproof coating on the ground, plus the original waterproof layer to form a composite waterproof layer to enhance the waterproof performance.
6. The water pipe groove in the wall shall also be waterproof. During the construction process, when the pipeline and floor drain pass through the floor slab, the waterproof layer around the hole must be constructed carefully. Buried water pipes in the wall shall be arranged reasonably. Grooves larger than the pipe diameter shall be made for laying water pipes. The plastering in the grooves shall be smooth, and then the grooves shall be painted with waterproof paint.
7. The 24-hour "water storage test" is used to check and accept the waterproofing. After the waterproofing works are completed, the door and the water outlet are sealed, and the water level in the toilet floor is filled up to a certain level, and marks are made. If there is no obvious drop in the level within 24 hours, especially if there is no leakage on the roof of the downstairs house, the waterproofing is qualified.
Code for waterproofing of toilet decoration
1. Waterproof construction is suitable for coating waterproof materials.
2. The performance of waterproof materials shall comply with the provisions of the current relevant national standards, and there shall be a product certificate.
3. The surface of the base course shall be flat and free from hollowing, sanding, cracking and other defects. The moisture content of base course shall meet the construction requirements of waterproof materials.
4. The waterproof layer shall extend from the ground to the wall and be 250mm higher than the ground. The height of waterproof layer of bathroom wall shall not be less than 1800mm.
5. The waterproof cement mortar leveling layer is tightly combined with the foundation without hollowing, the surface is smooth and clean without cracks and sanding, and the internal and external corners are made into circular arc shape.
6. The coating waterproof layer shall be evenly painted, and the thickness shall meet the requirements of the product technical regulations. Generally, the thickness shall not be less than 1.5mm and the bottom shall not be exposed.
7. The construction joint shall be lapped along the flow direction, with the lap width not less than 100mm. When more than two layers of glass fiber cloth are used for lap up and down, one half of the width shall be staggered.
8. The coating surface shall be free of blistering, flowing, flat, concave and convex, and the joints with pipe fittings, sanitary ware foundation, floor drain and drain outlet shall be tight and smooth without leakage.
9. The thickness and strength of the cement mortar of the protective layer must meet the design requirements. It is strictly prohibited to damage the waterproof layer during operation. According to the design requirements, the ground flashing slope shall be made, and the drainage shall be smooth without water accumulation and slope reversal.