Bathroom decoration is not only a very important part of house decoration, but also the most complex and tedious one. There are many details of bathroom decoration that need attention.


1. Bathroom threshold construction skill threshold is the first gateway of bathroom, which plays the role of water-proof and space division in bathroom, and also has the significance of gathering money in geomancy. One of the key points in the construction and design of the doorsill is to pay attention to the inclination of the upper plane of the doorsill to the inner side of the bathroom, so that the moisture can slide smoothly to the floor drain inside the bathroom. The second key point of threshold construction is to be the same width as the door frame, and the door frame must be the same thickness as the wall, so that the size can be the same when laying the floor tiles, which is very effective to prevent the cracks.


2. At present, the waterproof construction technique of the bathroom floor is mainly used in the waterproof materials of the floor. When laying the waterproof layer of the bathroom, it should be laid to 20 cm above the wall foot, and the height of the waterproof layer should not be lower than the height of the threshold. When reserving the pipeline for floor oil, the waterproof layer shall keep the reserved pipeline. After the waterproof layer is completed and dried, it shall be immediately bottomed with cement mortar to prevent the waterproof layer from being damaged.


3. When laying the floor tile details, pay attention to the consistency of the joint thickness of the floor tile and the alignment with the joint of the wall tile; the floor tile should have a drainage slope. If the bathtub is installed in the bathroom, the front wall of the bathtub must be tiled with bricks. The floor tile should be first pasted under the wall, and then pasted with the wall brick to avoid cracks.


4. The wire joint between the bathroom should be hung with tin, and then wrapped with waterproof tape and insulating tape to ensure safety and place leakage. Therefore, the wire body must be sheathed with flame-retardant pipe, and the switch and socket should preferably have a moisture-proof box, or be installed in a dry area.


5. Bathroom wall tiling details before tiling, the wall should also be moistureproof and waterproof. When tiling, the wall should be smooth and aligned with the floor tiles to ensure the overall sense of the wall and the ground.

6. The construction details of bathroom floor drain are generally large when the new house is handed over, so it is necessary to repair the drainage reserved hole to make it coincide with the purchased floor drain. In order to prevent the entrance of hair, sludge, sand and other pollutants, the hole diameter of the renovated floor drain grate shall be controlled between 6-8mm.