Send you a waterproof strategy for bathroom
Send you a waterproof strategy for bathroom
Bathroom is always inseparable from water, so waterproof is a very important project for bathroom space. Next, Xiaobian tells you what are the precautions for waterproof bathroom.
1、 Choose materials carefully
Now there are various kinds of waterproof materials. If the quality of the selected waterproof materials is unqualified, leakage will occur within two or three years. Therefore, we must be careful when selecting materials. The best choice for consumers is to choose a brand with certain popularity. Because now the market is overflowing with crooked goods, a large number of toxic materials that are explicitly eliminated and banned by the state are also pouring into the market. Therefore, it is more secure for consumers to choose brand products with high popularity, good reputation, high degree of anti-counterfeiting and international quality system certification.
2、 Standard construction method
It is very important to do well in the waterproof construction of toilet. Generally, the following points shall be paid attention to during the construction:
The first is ground treatment. Before waterproof treatment, the ground must be leveled first. If the ground is uneven, the waterproof effect may be affected, and the cracks and leakage caused by uneven thickness of waterproof coating may also be caused. Floor drain, wall corner, pipe root and other joints should use high elastic type flexible waterproof coating, because the joints between the bathroom wall and the ground will be displaced and easily seeped water.
Secondly, the wall treatment should be at least 30cm high waterproof to prevent water from seeping into the wall and returning to the damp. If there is a shower room in the toilet, the waterproof should be 180cm. If there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than that of the bathtub.
Finally, a certain period of time shall be reserved after the waterproof layer is completed to make the waterproof layer and the building better integrated, and then a protective layer and a floor tile shall be made on the waterproof layer. During the construction process, the waterproof layer shall be protected as much as possible. Because the waterproof construction is a concealed project, the subsequent construction may also damage the waterproof layer. If the floor tiles have been laid, do not smash the floor tiles. Use professional joint filling waterproof materials to block all the gaps and do a good job of waterproof. It is also applicable to waterproof works after failure of waterproof layer in toilet.
In a word, bathroom waterproofing is a systematic project, which involves all aspects of material purchase and construction. However, as long as the owners pay more attention to it, bathroom waterproofing is nothing!